All planning documents are only available in English.
All planning documents will be uploaded on Tuesday 9 September.
Mae'r holl ddogfennau cynllunio ar gael yn Saesneg unig. Bydd yr holl ddogfennau cynllunio ar gael o ddydd Mawrth 9 Medi.
Mae'r holl ddogfennau cynllunio ar gael yn Saesneg unig. Bydd yr holl ddogfennau cynllunio ar gael o ddydd Mawrth 9 Medi.
2. Plans and Elevations
- 2.0.1 Site Location Plan
- 2.0.2 Solar Site Layout
- 2.0.3 BESS Site Layout
- 2.0.4 Proposed Cable Corridor
- 2.0.5 Tracker Solar Panel Mounting Structure
- 2.0.6 Solar Site Power Conversion Unit
- 2.0.7 33kv Sub-distribution Switchroom
- 2.0.8 BESS Container
- 2.0.9 BESS Power Conversion Unit
- 2.0.10 Substation Compound
- 2.0.11 Substation ad Aux Transformers Buildings
- 2.0.12 Deer Fencing and Gate Details
- 2.0.13 Acoustic Fence
- 2.0.14 Security Fence Details
- 2.0.15 Solar and BESS Sites CCTV
- 2.0.16 Water Tank
- 2.0.17 Internal Access Track
- 2.0.18 Construction Compound
- 2.0.19 Illustrative Landscape and Ecology Strategy (Solar Site)
- 2.0.20 Illustrative Landscape and Ecology Strategy (BESS Site)
3. Planning Pack
- 3.0.1 Planning Statement
- 3.0.3 Design and Access Statement
- 3.0.4 Transport Statement
- 3.0.5 Outline Landscape and Ecology Management Plan
- 3.0.6 Green Infrastructure Statement
- 3.0.7 Noise Impact Assessment
- 3.0.8 Arboricultural Impact Assessment
- 3.0.9 Tree Constraints Plan
- 3.0.10 Tree Protection Plan (BESS Site)
- 3.0.11 Tree Protection Plan (Solar Site)
- 3.0.12 Tree Protection Plan (Cable Route)
- 3.0.13 Socio-Economic Statement
4.2 Environmental Statement Volume 2 Appendices and Figures
- 4.2.1 Appendix A.1 Site Location Plan (Ref01)
- 4.2.2 Appendix A.2 EIA Scoping Report Part 1
- 4.2.2 Appendix A.2 EIA Scoping Report Part 2
- 4.2.2 Appendix A.2 EIA Scoping Report Part 3
- 4.2.3 Appendix A.3 EIA Scoping Opinion
- 4.2.4 Appendix A.4 Statement of Expertise
- 4.2.5 Appendix A.5 Outline Construction Environmental Management Plan
- 4.2.6 Appendix A.6 Outline Decommissioning Environmental Management Plan
- 4.2.7 Appendix A.7 Outline Construction Traffic Management Plan
- 4.2.8 Appendix A.8 Existing and Approved Developments
- 4.2.9 Appendix A.9 Planning Drawings
- 4.2.10 Appendix B.1 Flood Consequence Assessment
- 4.2.11 Appendix B.2 Water Framework Directive Screening and Scoping
- 4.2.12 Appendix B.3 Proposed Drainage Strategy
- 4.2.13 Appendix C.1 Geophysical Survey
- 4.2.14 Appendix C.2 Phase 1 Archaeological Evaluation Interim Report
- 4.2.15 Appendix D.1 Climate Change Policy
- 4.2.16 Appendix D.2 Climate Projections Data
- 4.2.17 Appendix E.1 - Phase 1 Ground Conditions Assessment
- 4.2.18 Appendix E.2 - Mineral Resource Assessment Desk Study
- 4.2.19 Appendix F.1 Ecological Baseline Report
- 4.2.20 Appendix F.2 Shadow Habitats Regulations Assessment Report
- 4.2.21 Appendix F.3 Outline Ecological Construction Method Statement
- 4.2.22 Appendix F.4 Outline Landscape and Ecological Management Plan
- 4.2.23 Appendix F.5 Biodiversity Figures
- 4.2.24 Appendix G.1 Landscape and Visual Impact Assessment (LVIA) Baseline PART 1
- 4.2.24 Appendix G.1 Landscape and Visual Impact Assessment (LVIA) Baseline PART 2
- 4.2.24 Appendix G.1 Landscape and Visual Impact Assessment (LVIA) Baseline PART 3
- 4.2.25 Appendix G.2 LVIA Methodology
- 4.2.26 Appendix G.3 Schedule of Effects Tables
- 4.2.27 Appendix G.4 Residential Visual Amenity Assessment
- 4.2.28 Appendix H.1 Historic Environment Desk-Based Assessment Part 1
- 4.2.28 Appendix H.1 Historic Environment Desk-Based Assessment Part 2
- 4.2.29 Appendix I.1 - Population and Human Health Summary Statement
- 4.2.30 Appendix I.2 Agricultural Land Classification Report
- 4.2.31 Appendix I.3 Outline Battery Safety Management Plan
- 4.2.32 Appendix I.4 High-Level Electromagnetic Field Assessment
- 4.2.33 Appendix I.5 Outline Soil Management Plan
- 4.2.34 Appendix I.6 Glint and Glare Assessment